This guide is for CTOs, platform leads and operations owners who pay for a second region or recovery site that has never carried real traffic. It belongs to Netbase's cloud platform engineering work and sits next to the DevOps and platform engineering service, where runbooks, pipelines and monitoring are built.
In this guide
- Why does an untested second region usually fail when it is needed?
- Which exercise level fits your design today?
- What do failover game days typically find?
- How do you design and run a failover game day?
- How often should a team run failover exercises?
- When should you not run a full game day yet?
- Where AI fits
- What delivery record exists, and what does not
- Alternatives: who should run the exercise, and how do you choose?
- Limits of this guide
- Frequently asked questions
- Next step
Why does an untested second region usually fail when it is needed?
A recovery path that is never exercised drifts away from production: new services exist only in the primary region, a certificate expires in the standby, and the runbook names a tool the team has replaced.
The AWS Well-Architected guidance on testing disaster recovery puts it plainly: the only error recovery that works is the path you test frequently. Its example is a secondary data store whose capacity was enough at the last test but no longer carries the load when the primary fails.
A game day turns that assumption into a measurement. The people who would really be on call run the real recovery actions and record how long each step takes. The result is evidence that the design meets its recovery time (RTO) and data-loss (RPO) targets, or a list of fixes with owners.
Which exercise level fits your design today?
Each level proves something different, and each needs the previous one to pass first.
| Exercise level | What it proves | What it cannot prove | Run it when |
|---|---|---|---|
| Tabletop walk-through | People know the plan, roles and who declares a failover | Whether the automation, data and capacity work | Before any technical test, and after every change of team or runbook |
| Component fault injection | One dependency failing is handled: a database failover, a zone loss, a slow API | That the whole flow recovers in time across regions | Health checks, retries and alerts exist and can be watched |
| Full failover in a production-like copy | The complete switch works end to end: DNS, data, secrets, capacity, failback | Behaviour under real traffic and real data volume | Infrastructure is defined as code and a copy can be built on demand |
| Production failover | The real system meets its RTO and RPO with real users | Nothing more; it is the final proof | The copy passes, stop conditions exist and stakeholders have agreed the window |
The Microsoft reliability testing guidance follows the same order: start in non-production environments, move to production only with safeguards that limit the blast radius and allow a quick rollback, and test full failover and failback because pieces tested alone miss coordination failures.
Most teams with a warm standby or pilot light design should aim for a full failover in a production-like copy first. The disaster recovery tiers guide explains which tier needs which kind of proof.
What do failover game days typically find?
The same categories of findings appear across published guidance and post-incident write-ups. Plan the scenario so each of them is checked on purpose rather than discovered by accident.
-
Health checks stay green while real requests fail
- How the exercise catches it
- Fail the database behind a healthy endpoint and watch whether traffic moves
- Usual fix owner
- Application team
-
The second region lacks capacity or quota
- How the exercise catches it
- Send production-level load to it after the switch
- Usual fix owner
- Platform team
-
Secrets, certificates or feature flags exist only in the primary
- How the exercise catches it
- Start every service in the second region from a clean deploy
- Usual fix owner
- Platform and security
-
Monitoring and the runbook live in the failed region
- How the exercise catches it
- Run the exercise with the primary region's tools cut off
- Usual fix owner
- Operations
-
Hard-coded regional endpoints in code or partner integrations
- How the exercise catches it
- Trace outbound calls during the switch
- Usual fix owner
- Application team
-
DNS time-to-live and client caching slow the switch
- How the exercise catches it
- Measure from the decision to the last client moving
- Usual fix owner
- Platform team
-
Replication lag is larger than the RPO
- How the exercise catches it
- Compare the last write in the primary with the first read in the standby
- Usual fix owner
- Data owner
-
Failback was never written or tested
- How the exercise catches it
- Return to the primary in the same exercise
- Usual fix owner
- Operations
Failback is often harder than failover: data written in the second region must flow back before traffic returns. A game day that ends at "traffic is in region two" has tested half the plan.
How do you design and run a failover game day?
-
Write the hypothesis and success criteria
For example: "Checkout recovers in the second region within its RTO and loses no more data than its RPO." Use the targets agreed for the workload, not new ones invented for the day.
-
Set the scope and blast radius
Name the services, the environment and the users who could notice. Start with one critical flow rather than the whole estate.
-
Define stop conditions
Agree in advance which signals end the exercise at once, such as an error rate above an agreed threshold or a real incident elsewhere, and who has the authority to call it.
-
Assign roles
An incident lead, the engineers who run each step, a scribe who keeps the timing log and a communicator who informs stakeholders. Business owners should know the date and the scenario.
-
Rehearse the rollback first
The Google SRE chapter on emergency response describes a disaster test that lengthened an outage because its rollback procedure had not been tested; test the way back before the way out.
-
Run the scenario and log everything
Record the time of each decision and action, what the dashboards showed, and every manual workaround. Then fail back within the same exercise.
-
Hold the retrospective while memory is fresh
Turn each finding into a ticket with an owner and a due date, update the runbook, and schedule the next exercise before the meeting ends.
Managed services can automate parts of steps 3 and 6. AWS Fault Injection Service runs experiments from templates with stop conditions tied to alarms, and Azure Chaos Studio offers prepared scenarios such as zone or DNS outages. The hypothesis, roles and retrospective remain the team's work.
How often should a team run failover exercises?
Run a game day after every architecture change that touches the recovery path, and on a regular schedule otherwise. The AWS guidance on game days asks for a consistent, scheduled programme and names procedures that are documented but never exercised as an anti-pattern.
A practical rhythm: a tabletop when the on-call team or runbook changes, cheap component tests in the pipeline, and a full failover on a fixed calendar. The on-call and incident response guide covers the roles and runbooks the exercise depends on.
When should you not run a full game day yet?
Do not switch regions before single-region restores work. If backups do not restore within their targets, a cross-region test will only fail more expensively; the backup restore testing runbook is the earlier step.
Do not run a production failover without agreed RTO and RPO targets, stop conditions and a tested rollback, or during a sales peak or an open incident. If known gaps from the last exercise are still open, fix those first.
An internal tool covered by backup and restore needs a restore test, not a game day.
Where AI fits
AI helps with the preparation and the paperwork, never with the switch itself. An assistant can read infrastructure code and runbooks, list resources missing from the recovery definition and turn a timing log into a first retrospective. Netbase works with the major commercial and open-source AI tools and models, chosen per project.
Engineers run every step, own the stop decision and sign the measured times. An AI summary of an exercise that did not happen proves nothing.
- In delivered work
Product recommendation engine
Built for 4over4's online printing store from browsing and purchase history; a delivered AI feature named with a client, not a resilience project.
- Available capability
AI agents in operations
AI-assisted runbook review and drift checks before a game day are a way Netbase approaches the work, not yet tied to a published case.
What delivery record exists, and what does not
Netbase works as offshore development partner on a multi-tenant cloud ERP for a US client, not named, delivered as SaaS to small and mid-sized businesses, and builds and runs its own SaaS products, such as Cloodo Workspace. The cloud providers Netbase uses are AWS, Google Cloud, DigitalOcean and Cloudflare; no partner tier or cloud certification is claimed.
Netbase lists disaster recovery among its published security practices, next to role-based access control, MFA for admin dashboards and vulnerability scanning. Delivery follows a six-step lifecycle with weekly reviews and KPI dashboards. Most Netbase projects are delivered on fixed-price contracts.
No published Netbase record describes a client's failover exercise, and no recovery time, uptime or incident figure is claimed. This guide explains a method, not a case study.
Alternatives: who should run the exercise, and how do you choose?
| Option | Fits when | Watch for |
|---|---|---|
| Your own operations team runs it | An on-call rotation and runbooks already exist | The people who built the design may test only what they expect |
| A cloud provider's managed recovery or fault injection service | Most of the workload runs on one provider | It covers the provider's layer; application data and partner integrations stay with you |
| An external partner designs and facilitates it | No in-house platform engineer, or a first exercise before a launch or audit | The team must run the steps itself, or the knowledge leaves with the partner |
| Tabletop exercises only | Small, low-risk workloads or very early designs | Talk does not catch technical gaps; plan a technical test later |
Choose by three criteria: whether the team can stop and roll back an exercise without help, how far the recovery path crosses providers and partners, and who will own the findings after the day. For migrations still under way, the cloud migration cutover plan covers a one-time switch with rollback points, and cloud migration and modernization is where Netbase plans that move. Targets for the exercise come from SLOs and error budgets.
Limits of this guide
- It does not choose a disaster recovery tier or compare providers' recovery services by feature.
- Provider tools and features change; check the cited documentation before planning an exercise.
Plan the next step with a Netbase consultant
Frequently asked questions
Chaos engineering is the continuous practice of injecting faults to test a hypothesis about how a system behaves. A game day is a scheduled event in which the team exercises a whole response, people and process included, often using fault injection as its trigger.
Eventually, for workloads with tight recovery targets, because only production shows real traffic and data volume. Start in a production-like copy, add stop conditions and a tested rollback, and move to production once the copy passes.
Give every finding an owner and a due date, update the runbook and the recovery definition, and retest the fixed items in the next exercise.
Next step
If you want a failover exercise designed for your second region before the next launch or audit, book a solution review with Netbase.
Related services and solutions
AI-ready cloud platform engineering for SaaS and commerce workloads Netbase provides cloud platform engineering for SaaS and commerce teams that need a secure, repeatable home for their software and its AI features, on AWS, Google Cloud, DigitalOcean or Cloudflare. We design the architecture, write the environments as code, connect managed and AI services and hand over a platform your team can run, built the way we run ours.
Learn More
AI-assisted cloud migration with a cut-over plan and a way back Netbase provides cloud migration services for companies running business applications on ageing servers or hosting to move them to AWS, Google Cloud, DigitalOcean or Cloudflare without losing data or control. AI speeds up the code and dependency assessment; every migration still has an inventory, a rehearsed cut-over, cost controls from day one and a tested rollback point.
Learn More
AI-assisted DevOps and platform engineering for routine releases Netbase provides DevOps and platform engineering for SaaS and commerce teams to make releases routine instead of risky. We set up CI/CD pipelines, repeatable environments and observability on AWS, Google Cloud, DigitalOcean or Cloudflare, with AI assistance for tests, reviews and incident triage, so every change ships the same way and problems surface before customers notice.
Learn More
SaaS product accelerator: launch an AI-ready SaaS on proven Netbase modules A SaaS product accelerator is a set of reusable Netbase modules for accounts, billing, roles and integrations that helps founders and product teams launch subscription software faster, with room for in-product AI from the first release. Reusing these modules can shorten development time, and the approach is proven on Printcart, Netbase's own web-to-print SaaS.
Learn More
Work with Netbase remotely
Every Netbase engagement is delivered remotely, so clients in any country and any industry can work with us; Netbase has worked with clients in 80 countries. Contracts and invoices are issued by Netbase JSC, and payment is made by bank transfer to Netbase JSC's company account or PayPal Business. Talk to the CEO, Huy Nguyen (David), on WhatsApp or by email.
Discuss a project
Netbase JSC helps organizations design, build, modernize, and operate digital products and AI-enabled business systems.project@netbasejsc.com
+84 937 869 689
91 Nguyen Chi Thanh, Dong Da, Hanoi, Vietnam
Get in touch
Tell us what you want to build, modernize, or operate.